Montgomery Ranch 2 Wind
ERCOT queue ID 29INR0326
| Queue ID | 29INR0326 |
|---|---|
| Project name | Montgomery Ranch 2 Wind |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | Penumbra 345-kV |
| Point of interconnection | 60059 Penumbra 345-kV |
| County | Foard |
| State | TX |
| Voltage | Not reported |
| Capacity | 301.5 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalised for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | RWE Clean Energy Development, LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | WIN |
| Technology Code | WT |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.