Coleman, TX interconnection queue

7 active projects totalling 1,746.6 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

7active projects
1,746.6active MW
9total filed
Queue IDProjectkVMWResourceStatus
27INR0370 Ulysses Crossing Solar n/r 405.4 Solar Inactive
23INR0086 Hanson Solar 345 398.8 Solar SS Completed, FIS Completed, IA
28INR0469 Paintbrush PV1 345 251.5 Solar SS Completed, FIS Started, No IA
28INR0470 Paintbrush PV2 345 251.5 Solar SS Completed, FIS Started, No IA
29INR0220 Paintbrush PV3 345 251.5 Solar SS Completed, FIS Started, No IA
29INR0221 Paintbrush PV4 345 251.5 Solar SS Completed, FIS Started, No IA
29INR0222 Paintbrush BESS1 345 201.3 Battery SS Completed, FIS Started, No IA
27INR0415 Ulysses Crossing Storage n/r 150.8 Battery Inactive
23INR0794 Invictus Energy Storage 138 140.5 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.