Substation Scout

Invictus Energy Storage

ERCOT queue ID 23INR0794

Invictus Energy Storage (23INR0794) is listed in the ERCOT interconnection queue as a 140.5 MW battery project in Coleman County, TX. The filing names FIREROCK4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 31, 2028. It records the screening study as complete on March 28, 2024.

Queue ID23INR0794
Project nameInvictus Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationFIREROCK4A
Point of interconnection6390 FIREROCK4A 138kV
CountyColeman
StateTX
Voltage138 kV
Capacity140.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-05-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Coleman, TX: 9 requests in the ERCOT queue, 7 active totaling 1,746.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGSA Land Holdings
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2024-03-28

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.