Hanson Solar
ERCOT queue ID 23INR0086
Hanson Solar (23INR0086) is listed in the ERCOT interconnection queue as a 398.8 MW solar project in Coleman County, TX. The filing names tap Brown - Central Bluff as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of August 17, 2027. It records the screening study as complete on February 2, 2021, the full interconnection study as approved on March 26, 2026 and the interconnection agreement as signed on September 20, 2023.
| Queue ID | 23INR0086 |
|---|---|
| Project name | Hanson Solar |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | tap Brown - Central Bluff |
| Point of interconnection | tap 345kV 1444 Brown - 11406 Central Bluff |
| County | Coleman |
| State | TX |
| Voltage | 345 kV |
| Capacity | 398.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-08-17 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Coleman, TX: 9 requests in the ERCOT queue, 7 active totaling 1,746.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Hanson Solar, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2023-09-20 |
| Screening study complete | 2021-02-02 |
| Full interconnection study approved | 2026-03-26 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.