Young Road Solar
ERCOT queue ID 28INR0514
Young Road Solar (28INR0514) is listed in the ERCOT interconnection queue as a 101.7 MW solar project in Baylor County, TX. The filing names The POI B is TAP LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) SUB STATIONS. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 30, 2028. It records the screening study as complete on August 7, 2026.
| Queue ID | 28INR0514 |
|---|---|
| Project name | Young Road Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | The POI B is TAP LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) SUB STATIONS. |
| Point of interconnection | The POI B is TAP 69 KV LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) 69 KV SUB STATIONS. |
| County | Baylor |
| State | TX |
| Voltage | 69 kV |
| Capacity | 101.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-04-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Baylor, TX: 7 requests in the ERCOT queue, 6 active totaling 1,891 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | reNRG TX 5 LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2026-08-07 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.