Dresden
Named in 4 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
500kV in the quote
GTCproject sponsor
4projects in the plan
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “expand and reconfigure the Dresden 500kV bus” — TEAMS 20273
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: DRESDEN JUMPER REPLACEMENT Upgrade the limiting jumpers at Dresden on the Dresden - LaGrange 230kV line with higher rated jumpers. TEAMS 19598 · plan p.98 · zone 213 |
GTC | In the plan p.8 |
Jun 1, 2026 | No change | Dresden, LaGrange |
| GTC: DRESDEN - TALBOT 500kV LINE New 500kV line will be built from new Talbot substation to Dresden along with a new 500/230kV substation using 100C 3-1113 ACSR Bluejay conductor. TEAMS 19950 · plan p.208 · zone 213 |
GTC | In the plan p.16 |
Jun 1, 2029 | No change | Dresden, Talbot |
| GTC: DRESDEN 500kV BUS EXPANSION GTC will expand and reconfigure the Dresden 500kV bus. Loop the O'Hara - Wansley 500kV line into the Dresden 500kV substation and allow for future Dresden - Talbot 500kV line termination. TEAMS 20273 · plan p.109 · zone 208 |
GTC | In the plan p.9 |
Dec 1, 2026 | No change | Dresden, Ohara, Talbot, Wansley |
| GTC: DRESDEN JUMPER REPLACEMENT Replace the jumpers at Dresden limiting the Dresden - Yates 230kV line with higher rated jumpers. TEAMS 21626 · plan p.277 · zone 208 |
GTC | In the plan p.20 |
Jun 1, 2031 | New project | Dresden, Yates |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.