Substation Scout

Talbot

Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
3projects in the plan

Note. The plan prints "new Talbot substation" (TEAMS 19950), but another of its projects converts the existing Talbot County 230kV stations into the new 500/230kV facility, and Georgia Transmission's Dresden–Talbot project map ends the line at its existing-substation symbol labelled "TALBOT COUNTY SUBSTATION". It is not counted as new here. “Convert the 230kV Talbot County #1 and Talbot County #2 into a new 500/230kV facility” — TEAMS 21700

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
GTC: DRESDEN - TALBOT 500kV LINE
New 500kV line will be built from new Talbot substation to Dresden along with a new 500/230kV substation using 100C 3-1113 ACSR Bluejay conductor.
TEAMS 19950 · plan p.208 · zone 213
GTC In the plan
p.16
Jun 1, 2029 No change Dresden, Talbot
GTC: DRESDEN 500kV BUS EXPANSION
GTC will expand and reconfigure the Dresden 500kV bus. Loop the O'Hara - Wansley 500kV line into the Dresden 500kV substation and allow for future Dresden - Talbot 500kV line termination.
TEAMS 20273 · plan p.109 · zone 208
GTC In the plan
p.9
Dec 1, 2026 No change Dresden, Ohara, Talbot, Wansley
BIG TAZEWELL – PLANT FARLEY (APC) 500kV LINE
Construct a new 500kV line from Big Tazewell - Farley (APC) to substation, approximately 120 miles long. Construct a 500kV switching station to loop in the Blacksmith - Talbot 500kV line, terminate the new Farley - Tazewell 500kV and Talbot #2 - Tazewell 500kV lines.
TEAMS 21063 · plan p.191 · zone 216
GPC In the plan
p.15
Jun 1, 2029 Advanced from 2030 to 2029. Big Tazewell, Blacksmith, Farley, PLANT FARLEY, Talbot, Tazewell

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.