Ward County: substations in ERCOT transmission project tracking
25 substation names the workbook places in Ward County.
| Substation | Projects | Utilities | kV | HIFLD record |
|---|---|---|---|---|
| BAAH | 1 | TNMP | 138 | None |
| Bone Springs Tap to Fishhook | 1 | TNMP | 138 | None |
| Cedarvale | 1 | TNMP | 138 | None |
| Cedarvale to Bone Springs Tap | 1 | TNMP | 138 | None |
| Cerdarvale | 1 | TNMP | 138 | None |
| COYANOSA | 1 | TNMP | 138 | None |
| Creosote | 1 | ONCOR | 345 | None |
| Fishhook PSSE Bus# 38180 | 1 | TNMP | 138 | None |
| Horntaod | 1 | ONCOR | 345 | None |
| Horntoad | 1 | ONCOR | 345 | None |
| Little Star | 1 | ONCOR | 138 | None |
| Midiva | 1 | TNMP | 138 | None |
| Mivida PSSE Bus# 38152 | 1 | TNMP | 138 | None |
| Pecos | 1 | TNMP | 138 | None |
| Pecos Trail | 1 | ONCOR | 138 | None |
| Pyote | 1 | TNMP | 138 | Name and county agree |
| Riverton | 1 | ONCOR | 345 | None |
| Rock Draw | 1 | TNMP | 138 | None |
| Sand Lake | 8 | LCRATSC, ONCOR, ONCOR/LCRA TSC | 345, 765 | None |
| Silverleaf | 1 | TNMP | 138 | None |
| Spadefoot | 1 | ONCOR | 345 | None |
| Staghorn | 1 | TNMP | 138 | None |
| Ward | 1 | ONCOR | 138 | Name and county agree |
| Wickett | 2 | TNMP | 138 | Name and county agree |
| Wolf | 4 | ONCOR | 138 | None |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.
Site Scanner