Drill Hole
Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Culberson County. First named in the release with data as of October 1, 2024.
Culbersoncounty as printed
345, 765kV
ONCORutility
8projects listed
Also printed as: Drill Hole Switch
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Culberson, TX: ERCOT queue, 5 active of 7. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Drill Hole - Sand Lake 765 kV Line Add a new Drill Hole - Sand Lake 765 kV Line ERCOT project 103782 · utility no. R8892 · RPG 25RPG022 |
ONCOR Tier 1 |
Planned Future tab |
765 | May 2030 | Drill Hole to Sand Lake Culberson / Ward County |
Drill Hole, Sand Lake |
| Establish Drill Hole 345/138 kV Switch ERCOT project 87010 · utility no. R8725 · RPG 24RPG010 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2027 | Drill Hole Switch to Drill Hole Switch Culberson County |
Drill Hole Switch |
| Construct Drill Hole – Riverton 345 kV Double-Circuit ERCOT project 87021 · utility no. R8748 · RPG 24RPG010 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2027 | Drill Hole Switch to Riverton Switch Culberson / Reeves County |
Drill Hole Switch, Riverton Switch |
| Construct Mascho - Border - Drill Hole 345 kV DCKT Line Construct Mascho - Border - Drill Hole 345 kV DCKT Line. Also adds Permian Basin Reliability Plan Upgrade ID L2B. Loop the Stage 5 upgrade of new Clearfork - Drill Hole 345-kV double-circuit line into the new Border 345-kV substation ERCOT project 92734 · utility no. R8792 R8802 R8803 · RPG 24RPG015 |
ONCOR Tier 1 |
Planned Future tab |
345 | Jun 2028 | Mascho to Drill Hole Andrews / Culberson County |
Mascho, Drill Hole |
| Drill Hole - El Capitan (fka Culberson) 345 kV double-circuit line Add Permian Basin Reliability Plan Upgrade ID L5D Add a new Drill Hole - El Capitan (fka Culberson) 345-kV double-circuit line ERCOT project 99016 · utility no. PB_L5_D |
ONCOR Tier 2 |
Planned Future tab |
345 | Dec 2027 | Drill Hole to El Capitan Culberson County |
Drill Hole, El Capitan |
| Drill Hole 765/345 kV Autotransformer #1 Add Permian Basin Reliability Plan Upgrade ID 765_Import_1C. Establish the Drill Hole 765/345 kV Switch with one 765/345 kV autotransformer ERCOT project 99122 · utility no. PB_765_Import1_C |
ONCOR Tier 1 |
Planned Future tab |
765 | Dec 2028 | Drill Hole to Drill Hole Culberson County |
Drill Hole |
| Drill Hole - Longshore 765 kV Line Add Permian Basin Reliability Plan Upgrade ID 765_Import_1E. Add a new Longshore – Drill Hole 765-kV single-circuit line ERCOT project 99126 · utility no. PB_765_Import1_E |
ONCOR Tier 1 |
Planned Future tab |
765 | Dec 2028 | Drill Hole to Longshore Culberson / Howard County |
Drill Hole, Longshore |
| Drill Hole 765/345 kV Autotransformer #2 Add Permian Basin Reliability Plan Upgrade ID 765_Import_1C. Add a second 765/345 kV autotransformer at Drill Hole ERCOT project 99130 · utility no. PB_765_Import1_C |
ONCOR Tier 1 |
Planned Future tab |
765 | Dec 2029 | Drill Hole to Drill Hole Culberson County |
Drill Hole |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 103782 | First listed | on the Future tab |
| October 1, 2025 | 92734 | Projected in-service date | May 2029 → Jun 2028 |
| October 1, 2025 | 99016 | First listed | on the Future tab |
| October 1, 2025 | 99122 | First listed | on the Future tab |
| October 1, 2025 | 99126 | First listed | on the Future tab |
| October 1, 2025 | 99130 | First listed | on the Future tab |
| June 1, 2025 | 92734 | First listed | on the Future tab |
| February 1, 2025 | 87010 | Projected in-service date | Dec 2026 → Dec 2027 |
| February 1, 2025 | 87021 | Projected in-service date | Dec 2026 → Dec 2027 |
| October 1, 2024 | 87010 | First listed | on the Future tab |
| October 1, 2024 | 87021 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.