Big Hill

Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Schleicher County. First named in the release with data as of February 1, 2016.

Schleichercounty as printed
345, 765kV
AEP TNC, LCRATSC, ONCOR/LCRA TSCutility
4projects listed

Expansion at an existing substation: new voltage level. The quoted wording describes a yard, bus or conversion at a voltage this substation is not otherwise shown at. The HIFLD record of the same name and county shows 345 kV. “construct a new Big Hill 765-kV yard” — project 100466, as the utility reported it

A HIFLD substation record has the same name and county: BIG HILL (SCHLEICHER County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Schleicher, TX: ERCOT queue, 10 active of 12. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Big Hill 765-kV Substation Addition
LCRA TSC will construct a new Big Hill 765-kV yard adjacent to the existing Big Hill 345-kV Substation and install two new 765/345-kV autotransformers.
ERCOT project 100466 · utility no. PLC-8263 · RTP 2024-EHV-CORE-PB2b
LCRATSC
Tier 1
Planned
Future tab
765 Jun 2030 Big Hill
Schleicher County
Big Hill
Sand Lake - Big Hill (LCRA) 765 kV Line
Add Permian Basin Reliability Plan Upgrade ID 765_Import_2E. Add a new Big Hill – Sand Lake 765-kV single-circuit line
ERCOT project 100597 · utility no. PB_765_Import2_E
ONCOR/LCRA TSC
Tier 1
Planned
Future tab
765 Dec 2030 Sand Lake to Big Hill
Ward / Schleicher County
Sand Lake, Big Hill
Big Hill Dynamic Reactive Substation Upgrade
Add 500Mvar Cap bank at 345kV Big Hill substation as an LCP project for Batch Zero Base Load
ERCOT project 109906
LCRATSC
Tier 4
Conceptual
Future tab
345 Dec 2030 Big Hill
Schleicher County
Big Hill
Big Hill to Rockefeller Storage: Construct New 345 kV Line
Interconnect Rockefeller Storage to the existing Big Hill 345 kV station
ERCOT project 90047 · utility no. TP2024144
AEP TNC
Tier 4
Planned
Future tab
345 May 2027 Big Hill to Rockefeller Storage
Schleicher County
Big Hill, Rockefeller Storage

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026100466Projected in-service dateDec 2030 → Jun 2030
July 13, 2026109906First listedon the Future tab
October 1, 2025100466First listedon the Future tab
October 1, 2025100597First listedon the Future tab
February 1, 202590047First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.