Substation Scout

Nueces, TX interconnection queue

11 active projects totalling 2,151.7 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

11active projects
2,151.7active MW
12total filed
Queue IDProjectkVMWResourceStatus
27INR0047 Sunscape Renewable Energy Solar SLF 345 522.8 Solar SS Completed, FIS Started, IA
25INR0375 NavBoot BESS 138 303.7 Battery SS Completed, FIS Started, IA
24INR0528 Blanquilla BESS 138 200.8 Battery SS Completed, FIS Started, IA
28INR0437 Barbara BESS 138 200.5 Battery SS Completed, FIS Started, No IA
28INR0121 Jalisco Peaker 138 183.6 Gas SS Completed, FIS Started, No IA
27INR0337 Jalisco Cogen 138 167.8 Gas SS Completed, FIS Started, No IA
26INR0222 GOTHAM BESS 69 151.2 Battery SS Completed, FIS Started, No IA
25INR0076 Violet Storage 138 151 Battery SS Completed, FIS Started, No IA
23INR0061 Noria Solar DCC 345 145 Solar SS Completed, FIS Started, IA
25INR0329 Lynx Energy Storage 138 125.3 Battery SS Completed, FIS Completed, IA
23INR0062 Noria Storage n/r 75 Battery Inactive
27INR0048 Sunscape Renewable Energy Storage SLF 345 0 Battery SS Completed, FIS Started, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.