Substation Scout

Heights

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.

Harriscounty as printed
138kV
CNPutility
2projects listed

Expansion at an existing substation: new voltage level. The quoted wording describes a yard, bus or conversion at a voltage this substation is not otherwise shown at. “Convert Heights substation to 138kV” — project 73578D, as the utility reported it

No HIFLD substation record has this name in this county (a record of the same name exists in another county).

Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Heights 138kV Loop Conversion
Rebuild/Reconductor Dead Ckt.40Z to prepare for 138kV Conversion. De-energize Ckt.31C Dunlavy to Heights and repurpose as Ckt.09D tap to Dunlavy TR1 load.
ERCOT project 73578A
CNP
Tier 4
Planned
Current-year planned tab
138 Oct 2026 Dunlavy to Heights
Harris County
Dunlavy, Heights
Heights 138kV Loop Conversion
Convert Heights substation to 138kV service. Retire/repurpose portions of 69kV Ckts. 34A/34B for the new Heights 138kV loop. Reconfigure Ckt.09D to create new Ckt.09D Eureka TR2/TR3 tap to HE-DN_TR1 tap to Heights 138kV to White Oak. Reconductor any existing 1-795AAC limiting conductor to 2-959ACSS. Remove existing Heights 7.2 MVAR cap bank from Heights TR1.
ERCOT project 73578D
CNP
Tier 4
Planned
Current-year planned tab
138 Oct 2026 Heights to San Felipe/White Oak
Harris County
Heights, San Felipe, White Oak

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
February 1, 202673578AMoved between tabsFuture → Current-year planned
February 1, 202673578AProjected in-service dateMay 2026 → Oct 2026
February 1, 202673578DMoved between tabsFuture → Current-year planned
February 1, 202673578DProjected in-service dateMay 2026 → Oct 2026
October 1, 202473578AProjected in-service dateDec 2025 → May 2026
October 1, 202473578DProjected in-service dateDec 2025 → May 2026

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.