Addicks
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Harris County. First named in the release with data as of February 1, 2015.
A HIFLD substation record has the same name and county: ADDICKS (HARRIS County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Harris, TX: ERCOT queue, 30 active of 35 · MISO queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Addicks 345kV to White oak Ckt.71B Upgrades Upgrade Ckt.71B Addicks to White Oak to increase thermal limits ERCOT project 87344 |
CNP Tier 4 |
In-Service Completed tab |
345 | Feb 2026 actual 2026-01 |
Addicks to White Oak Harris County |
Addicks, White Oak |
| Facility Ratings Methodology Phase 2 (FRM2) Upgrades Upgrade Ckt.39B Addicks to Obrien to increase thermal limits as part of FRM2 upgrades. ERCOT project 99453S |
CNP Tier 4 |
Planned Future tab |
345 | May 2027 | Addicks to Obrien Harris County |
Addicks, Obrien |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 99453S | Moved between tabs | Current-year planned → Future |
| July 13, 2026 | 99453S | Projected in-service date | May 2026 → May 2027 |
| June 1, 2026 | 87344 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 87344 | Status as reported | Planned → In-Service |
| June 1, 2026 | 87344 | Projected in-service date | Jan 2026 → Feb 2026 |
| February 1, 2026 | 87344 | Projected in-service date | Dec 2025 → Jan 2026 |
| February 1, 2026 | 99453S | Moved between tabs | Future → Current-year planned |
| February 1, 2026 | 99453S | Projected in-service date | Oct 2029 → May 2026 |
| October 1, 2025 | 99453S | First listed | on the Future tab |
| June 1, 2025 | 87344 | Moved between tabs | Future → Current-year planned |
| February 1, 2025 | 87344 | Projected in-service date | Oct 2026 → Dec 2025 |
| October 1, 2024 | 87344 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.