Weaver

Named in 1 PJM planning document for 1 project, on February 3, 2026.

Newdescribed as
DAYTONzone
345 kVkV as printed
1mentions

Described as new: “Construct a new 345 kV substation named “Weaver”” — source, page 7

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dayton-2025-008 Conceptual $246M 05/01/2031 800 MW 2026-02-03
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 1/2029 → 05/01/2031 2025-09-09 2026-02-03
Substations named DARBY → DARBY; FLATLICK AEP; MARYSVILLE AEP; PATINA; PEORIA; WEAVER 2025-09-09 2026-02-03

Every mention

DateDocumentProjectWhat the document says about it
2026-02-03 TEAC
Item 06 - Dayton Supplemental Projects p. 7
Dayton-2025-008 “Construct a new 345 kV substation named “Weaver””
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.