Marysville (AEP)

Named in 1 PJM planning document for 1 project, on February 3, 2026.

Existingdescribed as
DAYTONzone
765 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dayton-2025-008 Conceptual $246M 05/01/2031 800 MW 2026-02-03
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 1/2029 → 05/01/2031 2025-09-09 2026-02-03
Substations named DARBY → DARBY; FLATLICK AEP; MARYSVILLE AEP; PATINA; PEORIA; WEAVER 2025-09-09 2026-02-03

Every mention

DateDocumentProjectWhat the document says about it
2026-02-03 TEAC
Item 06 - Dayton Supplemental Projects p. 7
Dayton-2025-008 “cutting into the existing 765 kV transmission line between Marysville (AEP) and Flatlick (AEP) Substation”
765 kV