Yankee substation interconnection queue
1 active project totaling 1 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Yankee as the point of interconnection, all in Montgomery County, OH.
Target commercial operation dates as filed run from Apr 2010 to May 2010 (2 filings).
1active projects
1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| V4-073 | Yankee 12.5kV | 12.5 | 1 | Solar | In Service | May 2010 |
| V4-035 | Yankee 12.5kV | 12.5 | 0 | Solar | Withdrawn | Apr 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Montgomery County, OH
- Crown-New Lebanon: 1 active, 29.9 MW of 2 filed
- Tait: 2 active, 28 MW of 8 filed