Substation Scout

Yankee substation interconnection queue

1 active project totalling 1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1active MW
2total filed
Queue IDProjectkVMWResourceStatus
V4-073 Yankee 12.5kV 12.5 1 Solar In Service
V4-035 Yankee 12.5kV 12.5 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.