Substation Scout

Montgomery, OH interconnection queue

6 active projects totalling 167.4 MW in the PJM queue, plus 16 with terminal status (shown greyed).

6active projects
167.4active MW
22total filed
Queue IDProjectkVMWResourceStatus
AE2-296 Hutchings West 69 kV 69 104 Gas Withdrawn
AF2-012 Tait 69 kV 69 104 Gas Withdrawn
AG1-207 Prairie Flyer Energy Storage 69 85 Battery Engineering and Procurement
AE1-030 Stuart-Clinton 345 kV II 345 60 Solar Withdrawn
AE1-031 Stuart-Clinton 345 kV III 345 60 Solar Withdrawn
AH2-242 Crown - New Lebanon 69 kV 69 40.5 Hybrid Withdrawn
AG2-691 New Lebanon - Ohio Hutchings 69 kV 69 39.7 Solar Withdrawn
AF2-298 Gem City Solar 69 29.9 Solar Engineering and Procurement
AE2-315 Yankee 1-7 69 23.5 Gas In Service
AF2-011 Tait 69 kV 69 20 Gas Withdrawn
AG1-132 Tait 69 kV 69 20 Gas Withdrawn
AI2-303 Crown-New Lebanon 69 kV 69 18.1 Solar Withdrawn
R14 Tait Generating Units 4-7 69 15 Gas In Service
S63 Tait Generating Station 69 13 Gas In Service
AG2-443 Benner 12 kV 12 1.9 Solar Withdrawn
V4-073 Yankee 12.5kV 12.5 1 Solar In Service
AA1-101 Tait 69kV 69 0 Battery Withdrawn
AG2-391 Route 30-Laurich 12 kV 12 0 Solar Withdrawn
AG2-392 Meason 12 kV 12 0 Solar Withdrawn
V4-035 Yankee 12.5kV 12.5 0 Solar Withdrawn
Y2-111 AES Tait Energy Storage 69 0 Battery Deactivated
Y3-080 AES Tait Energy Storage 69 0 Battery Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.