Tait substation interconnection queue
2 active projects totalling 28 MW in the PJM queue, plus 6 with terminal status (shown greyed).
2active projects
28active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-012 | Tait 69 kV | 69 | 104 | Gas | Withdrawn |
| AF2-011 | Tait 69 kV | 69 | 20 | Gas | Withdrawn |
| AG1-132 | Tait 69 kV | 69 | 20 | Gas | Withdrawn |
| R14 | Tait Generating Units 4-7 | 69 | 15 | Gas | In Service |
| S63 | Tait Generating Station | 69 | 13 | Gas | In Service |
| AA1-101 | Tait 69kV | 69 | 0 | Battery | Withdrawn |
| Y2-111 | AES Tait Energy Storage | 69 | 0 | Battery | Deactivated |
| Y3-080 | AES Tait Energy Storage | 69 | 0 | Battery | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.