Weirwood-Eastville substation interconnection queue

1 active project totalling 7.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
7.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z2-012 Hecate Energy Cherrydale 69 7.6 Solar In Service
X3-040 Weirwood-Eastville 69kV 69 0 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.