Northampton, VA interconnection queue
3 active projects totalling 17.5 MW in the PJM queue, plus 8 with terminal status (shown greyed).
3active projects
17.5active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-055 | Plaintation Creek 69 kV | 69 | 27 | Hybrid | Withdrawn |
| AH2-048 | Bayview 69kV | 69 | 20 | Battery | Withdrawn |
| V2-045 | Bayview | n/r | 12.4 | Solar | Withdrawn |
| C01-2152 | Kellam 24.9 kV | 24.9 | 9.4 | Battery | Active |
| G16 | Bayview 26kV (Wind) | 26 | 8 | Wind | Withdrawn |
| V3-061 | Bayview | n/r | 7.6 | Solar | Withdrawn |
| Z2-012 | Hecate Energy Cherrydale | 69 | 7.6 | Solar | In Service |
| X3-047 | Bayview 25kV | 25 | 0.7 | Offshore Wind | Withdrawn |
| Y2-109 | Bayview | 25 | 0.5 | Other | In Service |
| X3-040 | Weirwood-Eastville 69kV | 69 | 0 | Wind | Withdrawn |
| X4-014 | Kellam - Bayview 69kV | 69 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.