Northampton, VA interconnection queue

3 active projects totalling 17.5 MW in the PJM queue, plus 8 with terminal status (shown greyed).

3active projects
17.5active MW
11total filed
Queue IDProjectkVMWResourceStatus
AF2-055 Plaintation Creek 69 kV 69 27 Hybrid Withdrawn
AH2-048 Bayview 69kV 69 20 Battery Withdrawn
V2-045 Bayview n/r 12.4 Solar Withdrawn
C01-2152 Kellam 24.9 kV 24.9 9.4 Battery Active
G16 Bayview 26kV (Wind) 26 8 Wind Withdrawn
V3-061 Bayview n/r 7.6 Solar Withdrawn
Z2-012 Hecate Energy Cherrydale 69 7.6 Solar In Service
X3-047 Bayview 25kV 25 0.7 Offshore Wind Withdrawn
Y2-109 Bayview 25 0.5 Other In Service
X3-040 Weirwood-Eastville 69kV 69 0 Wind Withdrawn
X4-014 Kellam - Bayview 69kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.