Bayview substation interconnection queue

1 active project totalling 0.5 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
0.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
AH2-048 Bayview 69kV 69 20 Battery Withdrawn
V2-045 Bayview n/r 12.4 Solar Withdrawn
V3-061 Bayview n/r 7.6 Solar Withdrawn
X3-047 Bayview 25kV 25 0.7 Offshore Wind Withdrawn
Y2-109 Bayview 25 0.5 Other In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.