St. Johns DP-REC substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name St. Johns DP-REC as the point of interconnection, all in King and Queen County, VA.
Target commercial operation date as filed: Jun 2023 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-183 | St. Johns DP-REC 115 kV | 115 | 35.5 | Solar | Withdrawn | Jun 2023 |
| AG1-187 | St. Johns DP-REC 115 kV | 115 | 14.5 | Battery | Withdrawn | Jun 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in King and Queen County, VA
- Harmony Village-Shackleford: 9 active, 146.6 MW of 11 filed
- Shackleford: 2 active, 12.2 MW of 3 filed
- Lawrenceville: 1 active, 11 MW of 3 filed
- Shacklefords: 2 active, 10.2 MW of 2 filed