Auglaize, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
AF1-113 Gristmill 345 kV 345 137.3 Solar Withdrawn
AG2-452 SW Lima - Shelby 345 kV 345 52.8 Wind Withdrawn
AF1-085 Southwest Lima-West Moulton 138 kV 138 32.3 Solar Withdrawn
AF2-059 Southwest Lima-West Moulton 138 kV 138 8.4 Solar Withdrawn
AG1-025 Southwest Lima-West Moulton 138 kV 138 8.4 Solar Withdrawn
AG2-033 Southwest Lima-West Moulton 138 kV 138 8.4 Solar Withdrawn
AC1-212 Minster III ESS 69 1.9 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.