Auglaize, OH interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-113 | Gristmill 345 kV | 345 | 137.3 | Solar | Withdrawn |
| AG2-452 | SW Lima - Shelby 345 kV | 345 | 52.8 | Wind | Withdrawn |
| AF1-085 | Southwest Lima-West Moulton 138 kV | 138 | 32.3 | Solar | Withdrawn |
| AF2-059 | Southwest Lima-West Moulton 138 kV | 138 | 8.4 | Solar | Withdrawn |
| AG1-025 | Southwest Lima-West Moulton 138 kV | 138 | 8.4 | Solar | Withdrawn |
| AG2-033 | Southwest Lima-West Moulton 138 kV | 138 | 8.4 | Solar | Withdrawn |
| AC1-212 | Minster III ESS | 69 | 1.9 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.