South Cumberland substation interconnection queue

1 active project totalling 30.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
30.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-227 Recreation Solar 69 30.7 Solar Suspended
AB1-167 South Cumberland 69kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.