4 active projects totalling 1,866.7 MW in the PJM queue, plus 2 with terminal status (shown greyed).

4active projects
1,866.7active MW
6total filed
Queue IDProjectkVMWResourceStatus
AB2-067 Guernsey Power Station 765 1,100 Gas In Service
AC1-044 Guernsey Power Station 765 550 Gas In Service
AD2-189 Guernsey Power Station 765 186 Gas In Service
AE1-227 Recreation Solar 69 30.7 Solar Suspended
AC1-124 Harryette 12kV 12 0 Battery Withdrawn
AC1-125 Harryette 12kV 12 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.