0 active projects
totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
W3-111
Turning Point Solar
69
7.6
Solar
Withdrawn
W3-112
Turning Point Solar
69
5.7
Solar
Withdrawn
W3-113
Turning Point Solar
69
5.7
Solar
Withdrawn
AB1-167
South Cumberland 69kV
69
0
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.