Noble, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
W3-111 Turning Point Solar 69 7.6 Solar Withdrawn
W3-112 Turning Point Solar 69 5.7 Solar Withdrawn
W3-113 Turning Point Solar 69 5.7 Solar Withdrawn
AB1-167 South Cumberland 69kV 69 0 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.