Noble, OH interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W3-111 | Turning Point Solar | 69 | 7.6 | Solar | Withdrawn |
| W3-112 | Turning Point Solar | 69 | 5.7 | Solar | Withdrawn |
| W3-113 | Turning Point Solar | 69 | 5.7 | Solar | Withdrawn |
| AB1-167 | South Cumberland 69kV | 69 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.