Sorenson substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-022 | Sorenson 345 kV | 345 | 450 | Battery | Withdrawn |
| AH2-414 | Sorenson 345 kV | 345 | 350 | Battery | Withdrawn |
| AH2-413 | Sorenson 345 kV | 345 | 339 | Hybrid | Withdrawn |
| AH1-548 | Sorenson 345 kV | 345 | 96 | Solar | Withdrawn |
| AH1-014 | Sorenson 345 kV | 345 | 67.1 | Solar | Withdrawn |
| AI2-425 | Sorenson 345 kV | 345 | 40 | Solar | Withdrawn |
| AI2-424 | Sorenson 345 kV | 345 | 28 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.