Substation Scout

Rock Creek substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Rock Creek as the point of interconnection, all in Huntington County, IN.

Target commercial operation dates as filed run from Dec 2025 to Dec 2026 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-150 Rock Creek 138 kV 138 44.4 Solar Withdrawn Dec 2025
AI1-003 Rock Creek 138 kV 138 34 Wind Withdrawn Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Huntington County, IN

All 13 PJM queue filings in Huntington County, IN.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first