Huntington, IN interconnection queue
1 active project totalling 24.1 MW in the PJM queue, plus 12 with terminal status (shown greyed).
1active projects
24.1active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-022 | Sorenson 345 kV | 345 | 450 | Battery | Withdrawn |
| AH2-414 | Sorenson 345 kV | 345 | 350 | Battery | Withdrawn |
| AH2-413 | Sorenson 345 kV | 345 | 339 | Hybrid | Withdrawn |
| AF1-092 | Bowfin Solar | 138 | 115 | Hybrid | Withdrawn |
| AH1-291 | Rock Creek-Hummel Creek 138 kV | 138 | 111 | Solar | Withdrawn |
| AH1-548 | Sorenson 345 kV | 345 | 96 | Solar | Withdrawn |
| AH1-014 | Sorenson 345 kV | 345 | 67.1 | Solar | Withdrawn |
| AI2-150 | Rock Creek 138 kV | 138 | 44.4 | Solar | Withdrawn |
| AI2-425 | Sorenson 345 kV | 345 | 40 | Solar | Withdrawn |
| AI1-003 | Rock Creek 138 kV | 138 | 34 | Wind | Withdrawn |
| AI2-424 | Sorenson 345 kV | 345 | 28 | Solar | Withdrawn |
| AF2-094 | Huntington Jct. 138 kV | 138 | 26.4 | Solar | Withdrawn |
| AE2-234 | Maple Solar | 69 | 24.1 | Solar | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.