Huntington Jct. substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-092 Bowfin Solar 138 115 Hybrid Withdrawn
AF2-094 Huntington Jct. 138 kV 138 26.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.