PJM queue ID AF2-144

Scott 1 BESS (AF2-144) is listed in the PJM interconnection queue as a 10.2 MW hybrid project in Powhatan County, VA. The filing names Powhatan as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2023.

Queue IDAF2-144
Project nameScott 1 BESS
Status (as published)In Service
SubstationPowhatan
Point of interconnectionPowhatan 34.5 kV
CountyPowhatan
StateVA
Voltage34.5 kV
Capacity10.2 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2023-06-01
Source datasetserial

Same substation and county

Powhatan substation: 5 requests in the PJM queue, 3 active totaling 36 MW.

Queue IDProjectMWResourceStatus
AB2-026Powhatan 34.5kV13.8SolarIn Service
AE1-075Powhatan Solar I, LLC12SolarIn Service
AF2-244Powhatan 34.5 kV9.4SolarWithdrawn
AI2-274Powhatan 34.5 kV6.8HybridWithdrawn

Powhatan, VA: 9 requests in the PJM queue, 5 active totaling 105 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy17
MW capacity10.2
MFO17

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first