Great Cover Solar LLC (AD2-009) is listed in the PJM interconnection queue as a 48.1 MW solar project in Fulton County, PA. The filing names McConnellsburg as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2024.

Queue IDAD2-009
Project nameGreat Cover Solar LLC
Status (as published)In Service
SubstationMcConnellsburg
Point of interconnectionMcConnellsburg 138 kV
CountyFulton
StatePA
Voltage138 kV
Capacity48.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-03-31
Source datasetserial

Same substation and county

McConnellsburg substation: 6 requests in the PJM queue, 1 active totaling 48.1 MW.

Queue IDProjectMWResourceStatus
AE1-132McConnellsburg 138 kV51SolarWithdrawn
AC1-211McConnellsburg 138kV48.1SolarWithdrawn
AI2-297McConnellsburg 138 kV18.4SolarWithdrawn
AF2-116Great Cove Solar13.3SolarWithdrawn
W4-042Cove Creek Solar Project7.6SolarWithdrawn

Fulton, PA: 17 requests in the PJM queue, 2 active totaling 57.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy70
MW capacity48.1
MFO70

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.