Rocky Forge Wind
PJM queue ID AA1-038
Rocky Forge Wind (AA1-038) is listed in the PJM interconnection queue as a 10.1 MW wind project in Botetourt County, VA. The filing names Lexington-Low Moor as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of November 25, 2026.
| Queue ID | AA1-038 |
|---|---|
| Project name | Rocky Forge Wind |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Lexington-Low Moor |
| Point of interconnection | Lexington-Low Moor 230kV |
| County | Botetourt |
| State | VA |
| Voltage | 230 kV |
| Capacity | 10.1 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2026-11-25 |
| Source dataset | serial |
Same substation and county
Lexington-Low Moor substation: 2 requests in the PJM queue, 1 active totaling 10.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-225 | Lexington-Low Moor 230kV | 32 | Wind | Withdrawn |
Botetourt, VA: 13 requests in the PJM queue, 4 active totaling 342.1 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-12 | Status change | n/a | Under Construction → Partially in Service - Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 78.2 |
| MW capacity | 10.1 |
| MFO | 78.2 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.