Flemingsburg substation interconnection queue
1 active project totaling 0 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Flemingsburg as the point of interconnection, all in KY.
Target commercial operation dates as filed run from Dec 2015 to Sep 2027 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: EKPC (1 filing).
1active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Y3-031A_EKPC2 | Flemingsburg 138 KV | 138 | 19.5 | Wind | Withdrawn | Dec 2015 |
| C01-1060 | Flemingsburg 12 kV | 12 | 0 | Solar | Active | Sep 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fleming County, KY
- Flemingsburg - Spurlock: 1 active, 48 MW of 3 filed
- Hillsboro: none active of 10 filed