Substation Scout

Flemingsburg substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Y3-031A_EKPC2 Flemingsburg 138 KV 138 19.5 Wind Withdrawn
C01-1060 Flemingsburg 12 kV 12 0 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.