Substation Scout

Flemingsburg 12 kV

PJM queue ID C01-1060

Flemingsburg 12 kV (C01-1060) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Fleming County, KY. The filing names Flemingsburg as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 1, 2027.

Queue IDC01-1060
Project nameFlemingsburg 12 kV
Status (as published)Active
SubstationFlemingsburg
Point of interconnectionFlemingsburg 12 kV
CountyFleming
StateKY
Voltage12 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-09-01
Source datasetcycle

Same substation and county

Flemingsburg substation: 2 requests in the PJM queue, 1 active totaling 0 MW.

Queue IDProjectMWResourceStatus
Y3-031A_EKPC2Flemingsburg 138 KV19.5WindWithdrawn

Fleming, KY: 12 requests in the PJM queue, 5 active totaling 281.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperEDPR NA Distributed Generation LLC
Transmission ownerEKPC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy4.77
MW capacity0.0
MFO4.77
Submitted date3/4/2026
Last updated10/2/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.