Prospect Power
PJM queue ID AF1-028
Prospect Power (AF1-028) is listed in the PJM interconnection queue as a 150 MW battery project in Rockingham County, VA. The filing names Endless Caverns as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of May 31, 2026.
| Queue ID | AF1-028 |
|---|---|
| Project name | Prospect Power |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Endless Caverns |
| Point of interconnection | Endless Caverns 115 kV |
| County | Rockingham |
| State | VA |
| Voltage | 115 kV |
| Capacity | 150 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-05-31 |
| Source dataset | serial |
Same substation and county
Endless Caverns substation: 5 requests in the PJM queue, 2 active totaling 200 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1383 | Endless Caverns 115 kV | 50 | Battery | Active |
| AG1-151 | Endless Caverns 115 kV | 100 | Battery | Withdrawn |
| AD1-080 | Endless Caverns 34.5 kV | 12.3 | Solar | Withdrawn |
| AE1-098 | Endless Caverns Solar | 10.4 | Solar | Withdrawn |
Rockingham, VA: 26 requests in the PJM queue, 4 active totaling 235 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 150 |
| MW capacity | 150 |
| MFO | 150 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.