Dumont - Greentown substation interconnection queue
2 active projects totalling 1,862.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
1,862.2active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2020 | Dumont - Greentown 765 kV | 765 | 931.1 | Gas | Active |
| C01-2023 | Dumont - Greentown 765 kV | 765 | 931.1 | Gas | Active |
| AG2-330 | Dumont - Greentown 765 kV | 765 | 156 | Battery | Withdrawn |
| AG2-328 | Dumont - Greentown 765 kV | 765 | 26 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.