Dumont-Greentown substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Dumont-Greentown as the point of interconnection, all in IN.

Target commercial operation dates as filed run from Aug 2018 to Dec 2028 (3 filings).

Transmission owner as filed: AEP (2 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
X1-020 Dumont-Greentown 765kV 765 195 Wind Withdrawn Aug 2018
AG2-165 Dumont-Greentown 765 kV 765 26 Solar Withdrawn Dec 2028
AG2-212 Dumont-Greentown 765 kV 765 26 Solar Withdrawn Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Dumont-Greentown” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Cass County, IN

No other substation in Cass County, IN is named as a point of interconnection in the PJM queue.

All 1 PJM queue filings in Cass County, IN.

Other PJM queue substations in Marshall County, IN

All 8 PJM queue filings in Marshall County, IN.