Dumont-Greentown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
X1-020 Dumont-Greentown 765kV 765 195 Wind Withdrawn
AG2-165 Dumont-Greentown 765 kV 765 26 Solar Withdrawn
AG2-212 Dumont-Greentown 765 kV 765 26 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.