Derwood substation interconnection queue
1 active project totalling 3 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| D29 | Derwood 13kV | 13 | 3 | Gas | In Service |
| S01 | Gude LF | 13 | 1 | Gas | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.