DeQuine 345 kV (C01-1278) is listed in the PJM interconnection queue as a 54 MW wind project in Tippecanoe County, IN. The filing names DeQuine as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2026.

Queue IDC01-1278
Project nameDeQuine 345 kV
Status (as published)Active
SubstationDeQuine
Point of interconnectionDeQuine 345 kV
CountyTippecanoe
StateIN
Voltage345 kV
Capacity54 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2026-06-01
Source datasetcycle

Same substation and county

DeQuine substation: 3 requests in the PJM queue, 3 active totaling 159.8 MW.

Queue IDProjectMWResourceStatus
C01-1277DeQuine 345 kV78.7WindActive
C01-1279DeQuine 345 kV27.1WindActive

Tippecanoe, IN: 3 requests in the PJM queue, 3 active totaling 159.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperFowler Ridge II Wind Farm LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity54.0
MFO200.0
Submitted date4/24/2026
Last updated6/8/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first