DeQuine 345 kV (C01-1279) is listed in the PJM interconnection queue as a 27.1 MW wind project in Tippecanoe County, IN. The filing names DeQuine as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2026.
| Queue ID | C01-1279 |
|---|---|
| Project name | DeQuine 345 kV |
| Status (as published) | Active |
| Substation | DeQuine |
| Point of interconnection | DeQuine 345 kV |
| County | Tippecanoe |
| State | IN |
| Voltage | 345 kV |
| Capacity | 27.1 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2026-06-01 |
| Source dataset | cycle |
Same substation and county
DeQuine substation: 3 requests in the PJM queue, 3 active totaling 159.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1277 | DeQuine 345 kV | 78.7 | Wind | Active |
| C01-1278 | DeQuine 345 kV | 54 | Wind | Active |
Tippecanoe, IN: 3 requests in the PJM queue, 3 active totaling 159.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Fowler Ridge III Wind Farm LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 27.1 |
| MFO | 99.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.