Continental substation interconnection queue
2 active projects
totalling 30 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2 active projects
30 active MW
3 total filed
Queue ID Project kV MW Resource Status
AD1-101
Blue Harvest Solar Park
69
19
Solar
In Service
AI2-118
Continental 69 kV
69
12
Solar
Withdrawn
AG2-405
Continental 69 kV
69
11
Solar
Active
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.