Continental substation interconnection queue
2 active projects totaling 30 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Continental as the point of interconnection, all in Putnam County, OH.
Target commercial operation dates as filed run from Jun 2023 to Dec 2025 (3 filings).
Transmission owner as filed: AEP (1 filing).
2active projects
30active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-101 | Blue Harvest Solar Park | 69 | 19 | Solar | In Service | Jun 2023 |
| AI2-118 | Continental 69 kV | 69 | 12 | Solar | Withdrawn | Jun 2023 |
| AG2-405 | Continental 69 kV | 69 | 11 | Solar | Active | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Putnam County, OH
- Buckskin: 2 active, 77.2 MW of 10 filed
- East Leipsic: none active of 2 filed
- East Leipsic - Richland: none active of 2 filed