Putnam, OH interconnection queue
4 active projects totalling 169 MW in the PJM queue, plus 6 with terminal status (shown greyed).
4active projects
169active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-072 | Powell Creek Solar | 138 | 90 | Solar | In Service |
| AI2-035 | East Leipsic - Richland 138 kV | 138 | 90 | Solar | Withdrawn |
| C01-1362 | East Leipsic – Richland 138 kV circuit (AE2-072 TAP) 138 kV | 138 | 49 | Battery | Active |
| AI2-246 | East Leipsic - Richland 138 kV | 138 | 48 | Solar | Withdrawn |
| V2-006 | Leipsic Wind Project | 138 | 19.5 | Wind | Withdrawn |
| AD1-101 | Blue Harvest Solar Park | 69 | 19 | Solar | In Service |
| W2-007 | East Leipsic 138kV | 138 | 13 | Wind | Withdrawn |
| AI2-118 | Continental 69 kV | 69 | 12 | Solar | Withdrawn |
| AG2-405 | Continental 69 kV | 69 | 11 | Solar | Active |
| W3-170 | Buckskin 69kV | 69 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.