Collingwood-Hiple substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Collingwood-Hiple as the point of interconnection, all in IN.
Target commercial operation dates as filed run from Jun 2010 to Dec 2013 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| R61 | Collingwood-Hiple 345kV | 345 | 70 | Wind | Withdrawn | Jun 2010 |
| X1-040 | Collingwood-Hiple 345kV | 345 | 46.8 | Wind | Withdrawn | Dec 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in LeGrange County, IN
No other substation in LeGrange County, IN is named as a point of interconnection in the PJM queue.
Other PJM queue substations in DeKalb County, IN
- Varner: none active of 4 filed