LeGrange, IN interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
R61 Collingwood-Hiple 345kV 345 70 Wind Withdrawn
Y2-107 Robison Park-Argenta 345 kV 345 26 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.