Varner substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Varner as the point of interconnection, all in DeKalb County, IN.
Target commercial operation dates as filed run from May 2022 to Dec 2027 (4 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-576 | Varner 345 kV | 345 | 108 | Solar | Withdrawn | Dec 2024 |
| AF1-141 | Thalassa Energy Project | 138 | 62.8 | Solar | Withdrawn | May 2022 |
| AI2-421 | Varner 345 kV | 345 | 43.2 | Solar | Withdrawn | Dec 2027 |
| AF2-125 | Varner 138 kV | 138 | 35.5 | Solar | Withdrawn | Apr 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in DeKalb County, IN