Varner substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Varner as the point of interconnection, all in DeKalb County, IN.

Target commercial operation dates as filed run from May 2022 to Dec 2027 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-576 Varner 345 kV 345 108 Solar Withdrawn Dec 2024
AF1-141 Thalassa Energy Project 138 62.8 Solar Withdrawn May 2022
AI2-421 Varner 345 kV 345 43.2 Solar Withdrawn Dec 2027
AF2-125 Varner 138 kV 138 35.5 Solar Withdrawn Apr 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in DeKalb County, IN

All 11 PJM queue filings in DeKalb County, IN.