DeKalb, IN interconnection queue

2 active projects totalling 1,069.5 MW in the PJM queue, plus 9 with terminal status (shown greyed).

2active projects
1,069.5active MW
11total filed
Queue IDProjectkVMWResourceStatus
C01-1952 Varner 345 kV 345 931.1 Gas Active
C01-2254 South Butler 345 kV 345 808.9 Gas Withdrawn
AF1-091 Sculpin Solar 138 138.4 Solar Engineering and Procurement
AG2-576 Varner 345 kV 345 108 Solar Withdrawn
AF1-141 Thalassa Energy Project 138 62.8 Solar Withdrawn
X1-040 Collingwood-Hiple 345kV 345 46.8 Wind Withdrawn
AI2-421 Varner 345 kV 345 43.2 Solar Withdrawn
AF2-125 Varner 138 kV 138 35.5 Solar Withdrawn
AI2-065 Varner - Sours 138 kV 138 12.8 Solar Withdrawn
C01-1041 Auburn - Clipper 69 kV 69 10.1 Solar Withdrawn
AI2-430 Auburn 69 kV 69 10 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.