Chestnut substation interconnection queue
2 active projects totalling 347.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
347.7active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2046 | Chestnut 345 kV | 345 | 320 | Battery | Active |
| AD2-159 | Chestnut 345kV | 345 | 33 | Wind | Withdrawn |
| AH1-541 | Chestnut 345 kV | 345 | 27.7 | Hybrid | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.