1 active project totaling 39.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Blue Mound-Latham as the point of interconnection, all in Macon County, IL.

Target commercial operation dates as filed run from Oct 2017 to Jun 2019 (2 filings).

1active projects
39.8active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
W4-005 Radford's Run Wind Farm n/r 39.8 Wind In Service Jun 2019
AA1-086 Blue Mound-Latham n/r 26 Wind Withdrawn Oct 2017

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.