Blue Mound-Latham substation interconnection queue
1 active project totaling 39.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Blue Mound-Latham as the point of interconnection, all in Macon County, IL.
Target commercial operation dates as filed run from Oct 2017 to Jun 2019 (2 filings).
1active projects
39.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W4-005 | Radford's Run Wind Farm | n/r | 39.8 | Wind | In Service | Jun 2019 |
| AA1-086 | Blue Mound-Latham | n/r | 26 | Wind | Withdrawn | Oct 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Macon County, IL
- Chestnut: 2 active, 347.7 MW of 3 filed