Macon, IL interconnection queue

3 active projects totalling 387.5 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
387.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-2046 Chestnut 345 kV 345 320 Battery Active
W4-005 Radford's Run Wind Farm n/r 39.8 Wind In Service
AD2-159 Chestnut 345kV 345 33 Wind Withdrawn
AH1-541 Chestnut 345 kV 345 27.7 Hybrid Active
AA1-086 Blue Mound-Latham n/r 26 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.