Macon, IL interconnection queue
2 active projects totalling 359.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
359.8active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2046 | Chestnut 345 kV | 345 | 320 | Battery | Active |
| W4-005 | Radford's Run Wind Farm | n/r | 39.8 | Wind | In Service |
| AD2-159 | Chestnut 345kV | 345 | 33 | Wind | Withdrawn |
| AA1-086 | Blue Mound-Latham | n/r | 26 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.